Well Start contributes to early delivery and CapEx savings

By Aquaterra Energy
08 Jul 2020

A North Sea operator awarded Aquaterra Energy with a contract to provide its Well Start solution for its high-pressure/high-temperature (HPHT) gas field, located in the UK continental shelf (UKCS). We were awarded the project in 2015 to assist with the planning of the development. Since then we have continued to provide services and equipment supply through to present day, providing a completely integrated approach that has significantly de-risked the project.

Download this case study to learn how using our Well Start service for early well initiation supported this operator throughout their project and the products and services that we provided that assisted early delivery and CAPEX savings.

WELL START

Aquaterra Energy’s Well Start is a comprehensive range of highly-engineered products and services that are needed in the critical first phase of a well’s life. By taking care of any non-drilling challenges regarding interfaces, equipment and handling, Well Start allows drilling engineers to focus on what they do best.

Download the Well Start case study