EFFICIENT TOP-UP OF FAILED PRIMARY CEMENT JOB, FOLLOWING OUR SYSTEM DIAGNOSTICS

C L I E N T:

NORTH SEA OPERATOR

P R O D U C T:

CEMENT TOP-UP SYSTEM

Aquaterra Energy were contracted by a North Sea Operator to supply and run a conductor Cement Top-Up System to help ensure cement integrity to the required cement level during their drilling program, offshore Denmark.

We delivered a cement top-up system for a series of wells that were being drilled by the client, each time providing successful top-up after the system diagnostics had proved the primary cement job had not reached the required point of fixity.

In addition, we provided two offshore personnel for each operation and received high praise for the efficient installation that took place, whilst working online and further more whilst running in hole, as we ensured minimum disruption to the client’s running procedure.

The cement top-up system was provided as part of our Aquaterra Express services - offshore off the shelf tools and equipment for immediate lease.


Download


Cement Top-Up Systems & Aquaterra Express

 

Our cement top-up system is field proven and ensures that your conductor will perform as designed, reducing potential failure due to an inadequate primary cement job. We have a range of systems available from simple single point cement injections to multi-staged cement injection systems.

Our Aquaterra Express service provides offshore rental tools and equipment that is readily available. From subsea camera systems and cleaning tools to heavy lifting equipment, SUREcut Cold Cutters and centralisers. Get in touch to find out about our products and the availability of these.