Aquaterra Energy has secured a major contract for a High Pressure Marine Riser System from Apache North Sea Limited.
SERVICES
Subsea Installation Services
Requirements
- Install subsea equipment such as xmas trees, protective structures, or templates.
- Spud a subsea well.
- Accurate, reliable real-time information to assist subsea operations.
- Orientate a subsea wellhead housing.
- Increase certainty when working subsea.
- Improve decision making and reduce risk of damage or misalignment.
-
Rig time savings.
The Solution
Subsea cameras fitted to your equipment which relay real time colour video footage direct to the driller. These can be strategically positioned to view key areas such as interfacing parts, locking mechanisms and depth markings to assist with operations and to provide confirmation of a successful installation.
A retrievable fibre optic gyroscope is used when orientation and inclination are important. This provides precise positional data about your equipment. Where only inclination is of concern, a low cost inclinometer or bull’s-eye can be used to confirm your equipment is installed within tolerance.
Features & Benefits
- Accurate real time information to position, orientate and align your equipment.
- Reliable system which can view areas an ROV cannot reach.
- Quick and simple to install on any structure.
- Data logging and video capture facility for post-job reporting/analysis.
- Low cost cameras which can be abandoned subsea.









